Development record

Intent lifecycle and phase scheduling are orthogonal axes

adracceptedadr-34

Context

The record carried two contradicting definitions of what intents/planned/ means. intents/README.md defined it as "scoped into a roadmap phase", but the corpus disagreed in both directions: most planned intents (itd-20, itd-24, itd-29, itd-46, itd-48, itd-49, itd-50, itd-53, itd-58, itd-63, itd-65, itd-66, itd-67, itd-69, itd-72) appear in no phase doc's ## Scope, while two intents named in a phase ## Scope (itd-43 in Phase 0, itd-7 in Phase 6) still lived in drafts/. With "planned", "phased", and "draft" disagreeing, the roadmap cannot be used as a scheduler. (Captured as iss-3.)

The same README's own sequencing section already states the opposing model — "an intent listed in no phase doc's ## Scope is implicitly unscheduled" is a valid state (per adr-9) — so the record was contradicting itself, not merely drifting from the corpus.

Decision

  1. Two orthogonal axes. An intent's lifecycle is its commitment state, carried by directory location (adr-3): drafts/ = captured, uncommitted; planned/ = committed to build; shipped/ = built. An intent's scheduling is phase membership, carried editorially by a phase doc's ## Scope (adr-9). Neither axis is derived from the other.
  1. One directional invariant: scheduled ⇒ committed. Any intent named in a phase doc's ## Scope is committed by definition, so it lives in planned/ (or disciplines/ for discipline-kind intents). The converse does not hold: a planned intent with no phase is committed but unscheduled — a valid state, the committed bench awaiting sequencing (adr-9's unscheduled-intent rule, now explicitly extended beyond drafts/).
  1. Applied to the corpus. itd-43 (Phase 0 ## Scope) and itd-7 (Phase 6 ## Scope) move drafts/ → planned/; the fifteen planned-but-unscheduled intents stay where they are, now legally. intents/README.md's planned/ definition drops the "scoped into a roadmap phase" clause.
  1. Enumerations derive from the axes, not from each other. Any "later phase" or "out of scope" list is derived from ## Scope membership (the scheduling axis), never from the drafts/ directory (the lifecycle axis) — the two sets are different by design.

Alternatives Considered

  • planned/ = phased (enforce the README's old definition). Rejected: it forces every committed-but-unsequenced intent back to drafts/, erasing the commitment signal, or forces premature phase authoring just to keep files in place — exactly the stale forecasting the phases README refuses ("naming which intents land in which future phase before the phase is planned would only go stale").
  • A scheduled: frontmatter field on intents. Rejected: duplicates the phase docs' ## Scope (adr-9 made that mapping editorial and single-sourced) and reintroduces the stored-status drift adr-3/adr-5 exist to prevent.
  • Full orthogonality with no invariant (a phase may bundle a draft). Rejected: a phase ## Scope is a commitment to build; letting it name an uncommitted draft makes "committed" unreadable from either axis.

Consequences

  • itd-43 and itd-7 relocate to planned/; record-lint checks (the lint engine in internal/core/lint) can later enforce the scheduled ⇒ committed invariant mechanically.
  • intents/README.md describes planned/ as committed (scheduled or awaiting sequencing) and its directory listings match disk.
  • The out-of-scope/later-phase enumeration (brief/06-delivery/03-out-of-scope.md) is regenerated from ## Scope membership rather than the drafts directory — tracked as iss-8.
  • Hand-maintained intent counts keyed to "phased intents" (brief/01-product/04-scope.md) are re-derived on the scheduling axis — tracked as iss-7.