Development record
2026-07-08 — Predecessor spc-N artefacts inside intents (do-not-implement
decisiondcn-2607080000000013
2026-07-08 — Predecessor spc-N artefacts inside intents (do-not-implement banners, implementation-complete AC tables) are demoted to Prior Art design input per the delivery-state provenance doctrine — never implementation authority, never a delivery claim (iss-16 itd-66, iss-17 itd-50); their deltas become spec-time Open Questions.
Frontmatter
| id | dcn-2607080000000013 |
|---|---|
| type | decision |
| date | 2026-07-08 |
.abcd/work/decisions/dcn-2607080000000013-predecessor-spc-n-artefacts-inside.md
open on GitHub ↗ · commit history ↗
mentions4
- iss-16itd-66 carries a NON-CANONICAL / do-not-implement banner while being itd-65's declared blocker; reconcile the intent body with the native spec that owns the render contract
- iss-17itd-50 sits in planned/ but carries an implementation-complete AC reconciliation table; verify actual state and move through the shipped/ audit-notes path if true
- itd-50The Audit Loop Drives An Intent To Acceptance — Or Calls For A Replan
- itd-66abcd Renders The Exact Public Payload, Proves The Excludes Never Leak, And Smoke-Tests The Installed Surface Before Any Snapshot