Development record
2026-07-11 — Intent-lifecycle slice 1 (build sign-off given): the pipeline is
2026-07-11 — Intent-lifecycle slice 1 (build sign-off given): the pipeline is
dogfooded — itd-3 stays shipped as the reference fixture (option b), and a
new tightly-scoped intent itd-80-intent-lifecycle-automation (ACs = the
steel thread) is the pipeline's first real payload, driven drafts→planned→
shipped through the machinery it specifies. Slice scope: minimal native spec
store (internal/core/spec, directory-as-truth open/closed, intent: link),
abcd intent (plan/link/review-ingest + bare render) and abcd spec
(close + bare render) verbs, deterministic reconcile inside spec close
(no vendor event), host-delegated intent-fidelity-reviewer markdown agent
(Role 1 only) + async outbox/inbox verdict ingest to ## Audit Notes.
Frontmatter
| id | dcn-2607110000000006 |
|---|---|
| type | decision |
| date | 2026-07-11 |
.abcd/work/decisions/dcn-2607110000000006-intent-lifecycle-slice-1-build-sign-off.md
open on GitHub ↗ · commit history ↗