This is the record of an abcd-managed repository

abcdBetav0.16.2 · 2026-11-06

Development record

2026-09-02 — The readings open Iteration 2 and the build follows them, as the framework's section 13 states (maintainer, correcting the marker entry of the same day). Four intents complete Iteration 1's instrument and land before any reading runs: the two-operand invocation, itd-194, the preset windows and the comparative channel, together with the eval gate and the ledger hygiene. The opening widening reading and detection pass then run over Iteration 1's shipped state and claim record with the construal as it stands, marker included (framework section 12: a construal is readable while marked), and their outputs are dispositioned. The six remaining intents (admission and surprise verbs, reframe record, principles as a read object, condition disposition, reading-occasioned origin, scribe verbs) are the framework's own section 13 build list, planned in advance because the documents commit to them, and built at Step 5 after the dispositions, with the first admissions, surprises, reframes and condition dispositions hand-authored in the target format until each verb lands (framework 13, "schema before commands"; companion 5.6). The marker's lift is not a precondition of the widening run; it lifts when the maintainer judges the ledger the construal describes to be real. The sentence "the widening reading does not run before then" in the earlier marker entry is superseded by this one.

decisiondcn-2609020000000013

2026-09-02 — The readings open Iteration 2 and the build follows them, as the framework's section 13 states (maintainer, correcting the marker entry of the same day). Four intents complete Iteration 1's instrument and land before any reading runs: the two-operand invocation, itd-194, the preset windows and the comparative channel, together with the eval gate and the ledger hygiene. The opening widening reading and detection pass then run over Iteration 1's shipped state and claim record with the construal as it stands, marker included (framework section 12: a construal is readable while marked), and their outputs are dispositioned. The six remaining intents (admission and surprise verbs, reframe record, principles as a read object, condition disposition, reading-occasioned origin, scribe verbs) are the framework's own section 13 build list, planned in advance because the documents commit to them, and built at Step 5 after the dispositions, with the first admissions, surprises, reframes and condition dispositions hand-authored in the target format until each verb lands (framework 13, "schema before commands"; companion 5.6). The marker's lift is not a precondition of the widening run; it lifts when the maintainer judges the ledger the construal describes to be real. The sentence "the widening reading does not run before then" in the earlier marker entry is superseded by this one.

Frontmatter

iddcn-2609020000000013
typedecision
date2026-09-02

mentions1