This is the record of an abcd-managed repository

abcdBetav0.16.2 · 2026-11-06

Development record

2026-09-23 — The product thinker ruled on the owed items of the autonomous run of 2026-09-23 in one interview, one question at a time (07:51Z to 09:32Z, while the run was paused): two release blockers, two intents, the 35 major captures routed to the product thinker, and two older owed rulings. The release waits for two things: version-stamped plugin payloads (iss-2609230733497536, built by a run lane, with no criterion amended and no deferral) and a release press release composed at the cut from the shipped intents' press releases, which is a new capability and gets an intent and its planning interview before any lane builds it. The run may approve the release environment itself once every gate is green; that agenda line is written in the release commit, not here. itd-4's AC3 is built as written, the `--issue-drift` check and the rename of the back-links to `related_issues` / `related_intents` together, and spc-6 closes only when both land (the 2026-07-17 ruling stands). itd-43's third criterion is moot and dropped, so spc-8 closes. The guard contract is extended to read a host-supplied per-call working directory (iss-2609212142557657, option A), after a probe of what the host does when none is supplied. Four majors are ruled to a build (iss-2608231120121681 write-path smoke, iss-2608290810036869 preflight before the push connects, iss-2609090828371674 per-agent staging locks, iss-2609120505141653 the provenance comment) and do not hold the tag. The rulings that set a rule each have their own entry below; every other routed major is deferred past v0.9.0 with its ruling as the `deferral_reason`, and the 168 routed minor and nitpick captures take the run's default deferral. The product thinker also asked that the interview be kept as autonomous-run experiment data, towards making a run transparent to the person it serves; the observations feed the run's end-of-run research note. Rejected, as the frame: the run taking any of these rulings itself.

decisiondcn-2609230000000001

2026-09-23 — The product thinker ruled on the owed items of the autonomous run of 2026-09-23 in one interview, one question at a time (07:51Z to 09:32Z, while the run was paused): two release blockers, two intents, the 35 major captures routed to the product thinker, and two older owed rulings. The release waits for two things: version-stamped plugin payloads (iss-2609230733497536, built by a run lane, with no criterion amended and no deferral) and a release press release composed at the cut from the shipped intents' press releases, which is a new capability and gets an intent and its planning interview before any lane builds it. The run may approve the release environment itself once every gate is green; that agenda line is written in the release commit, not here. itd-4's AC3 is built as written, the --issue-drift check and the rename of the back-links to related_issues / related_intents together, and spc-6 closes only when both land (the 2026-07-17 ruling stands). itd-43's third criterion is moot and dropped, so spc-8 closes. The guard contract is extended to read a host-supplied per-call working directory (iss-2609212142557657, option A), after a probe of what the host does when none is supplied. Four majors are ruled to a build (iss-2608231120121681 write-path smoke, iss-2608290810036869 preflight before the push connects, iss-2609090828371674 per-agent staging locks, iss-2609120505141653 the provenance comment) and do not hold the tag. The rulings that set a rule each have their own entry below; every other routed major is deferred past v0.9.0 with its ruling as the deferral_reason, and the 168 routed minor and nitpick captures take the run's default deferral. The product thinker also asked that the interview be kept as autonomous-run experiment data, towards making a run transparent to the person it serves; the observations feed the run's end-of-run research note. Rejected, as the frame: the run taking any of these rulings itself.

Frontmatter

iddcn-2609230000000001
typedecision
date2026-09-23

mentions11