This is the record of an abcd-managed repository

abcdBetav0.16.2 · 2026-11-06

Development record

2026-09-24 — Release v0.10.0 is cut by autonomous run A, and the run's agenda line is: approve the publish step. Under ruling A2 of the product thinker's run A interview (2026-09-23 07:52Z, "approve the publish step": the product thinker authorises the run to approve the release environment itself once every gate is green), the run approves the `release` environment's deployment of v0.10.0 only after the merge queue, the verify job and every other gate on the tagged commit report green, and stops with a handover instead if any does not. The cut: v0.10.0, impact breaking, 43 records since v0.9.0 (nine shipped intents, thirty-four resolved or declined issues, four of them breaking), content commit 64ea8f62, the composer's payload accepted on the first ingest and recomposed once for two docs-currency findings. Both semantic gates ran at tier full: docs-currency-reviewer (Fable 5.1) with three findings, two fixed and one deferred because the load check's intent stays planned pending the product thinker's ruling on the stray definition (iss-2609231947544298); the brief-surface cross-check (40 pinned checkers, Opus 5.5, four at a time under the run's ceiling) with 154 findings, all deferred to their records: four user-facing ones captured as iss-2609240519413467, iss-2609240519418856, iss-2609240519471816 and iss-2609240519427388, one inside an appendix chapter captured as iss-2609240519422232, which records itd-147's ac-6 as not met, and the design-record drift to the systematic brief pass iss-2609091956001547.

decisiondcn-2609240000000003

2026-09-24 — Release v0.10.0 is cut by autonomous run A, and the run's agenda line is: approve the publish step. Under ruling A2 of the product thinker's run A interview (2026-09-23 07:52Z, "approve the publish step": the product thinker authorises the run to approve the release environment itself once every gate is green), the run approves the release environment's deployment of v0.10.0 only after the merge queue, the verify job and every other gate on the tagged commit report green, and stops with a handover instead if any does not. The cut: v0.10.0, impact breaking, 43 records since v0.9.0 (nine shipped intents, thirty-four resolved or declined issues, four of them breaking), content commit 64ea8f62, the composer's payload accepted on the first ingest and recomposed once for two docs-currency findings. Both semantic gates ran at tier full: docs-currency-reviewer (Fable 5.1) with three findings, two fixed and one deferred because the load check's intent stays planned pending the product thinker's ruling on the stray definition (iss-2609231947544298); the brief-surface cross-check (40 pinned checkers, Opus 5.5, four at a time under the run's ceiling) with 154 findings, all deferred to their records: four user-facing ones captured as iss-2609240519413467, iss-2609240519418856, iss-2609240519471816 and iss-2609240519427388, one inside an appendix chapter captured as iss-2609240519422232, which records itd-147's ac-6 as not met, and the design-record drift to the systematic brief pass iss-2609091956001547.

Frontmatter

iddcn-2609240000000003
typedecision
date2026-09-24

mentions8