This is the record of an abcd-managed repository

abcdBetav0.16.2 · 2026-11-06

Development record

2026-10-18 — The stall fix is its own intent, not a spec of the checklist draft (facilitator-on-delegation, itd-2610180912189125 planning): the slice (the away mode held by abcd, the stop check, and the question reroute) is filed as itd-2610180912189125, which builds on itd-2610170638184486, rather than planned as a first spec of that draft closed with a remainder; planning the draft would move it to planned before the product thinker has walked its criteria on Thursday, and its open trade-offs (the phone, the shared options) would then sit inside a planned record. A separate intent keeps the split with the coordination intent unchanged, since the slice touches nothing on the shared remote, and follows the precedent of itd-2610150602547271, filed as the first slice of itd-97. The idle time a coordinator sees stays out of the slice and comes with the coordination intent's central view (grounds: brief invariant 17; itd-2610150602547271; itd-2610170638184486 scope split; the coordination prep's ship-first decision)

decisiondcn-2610180913388445

2026-10-18 — The stall fix is its own intent, not a spec of the checklist draft (facilitator-on-delegation, itd-2610180912189125 planning): the slice (the away mode held by abcd, the stop check, and the question reroute) is filed as itd-2610180912189125, which builds on itd-2610170638184486, rather than planned as a first spec of that draft closed with a remainder; planning the draft would move it to planned before the product thinker has walked its criteria on Thursday, and its open trade-offs (the phone, the shared options) would then sit inside a planned record. A separate intent keeps the split with the coordination intent unchanged, since the slice touches nothing on the shared remote, and follows the precedent of itd-2610150602547271, filed as the first slice of itd-97. The idle time a coordinator sees stays out of the slice and comes with the coordination intent's central view (grounds: brief invariant 17; itd-2610150602547271; itd-2610170638184486 scope split; the coordination prep's ship-first decision)

Frontmatter

iddcn-2610180913388445
typedecision
date2026-10-18

mentions4