This is the record of an abcd-managed repository

abcdBetav0.16.2 · 2026-11-06

Development record

2026-10-18 — The go-public report from a managed repository (iss-2610180913363115) is filed at minor, not at the sender's major: it asks for a capability abcd lacks, a staged go-public flow, and reports no defect in what abcd does. Major and critical records are what the release cut holds on, and that guard exists for confirmed defects, so a feature request at major would hold every cut until a multi-day feature ships. Decided by the technical facilitator on the product thinker's delegation, while the product thinker is away.

decisiondcn-2610180914543900

2026-10-18 — The go-public report from a managed repository (iss-2610180913363115) is filed at minor, not at the sender's major: it asks for a capability abcd lacks, a staged go-public flow, and reports no defect in what abcd does. Major and critical records are what the release cut holds on, and that guard exists for confirmed defects, so a feature request at major would hold every cut until a multi-day feature ships. Decided by the technical facilitator on the product thinker's delegation, while the product thinker is away.

Frontmatter

iddcn-2610180914543900
typedecision
date2026-10-18

mentions1