2026-10-31 — spc-2609202134338445 step 11, fix round 2: a record the auto-plan's plan stage finds already in planned/ is never counted as the run's plan; the lane is handed back citing no verdict and the planned record is left as it is. This replaces the crediting of a plan found after the lane was marked as planning, and the limit dcn-2610310456565451 recorded with it. Grounds: a second step stopped after intent plan and before its state write leaves the same record another act's plan would, and the run cannot tell them apart; handing both back costs a run that ends handed back after a stopped step, which the person resolves by reading the plan, while crediting both would cite reviews for a plan they did not judge. The two plan steps stay: the mark says, in the hand-back, whether the run might have made the plan, and the stored-state check still requires it for a recorded plan.

decisiondcn-2610311034456152

2026-10-31 — spc-2609202134338445 step 11, fix round 2: a record the auto-plan's plan stage finds already in planned/ is never counted as the run's plan; the lane is handed back citing no verdict and the planned record is left as it is. This replaces the crediting of a plan found after the lane was marked as planning, and the limit dcn-2610310456565451 recorded with it. Grounds: a second step stopped after intent plan and before its state write leaves the same record another act's plan would, and the run cannot tell them apart; handing both back costs a run that ends handed back after a stopped step, which the person resolves by reading the plan, while crediting both would cite reviews for a plan they did not judge. The two plan steps stay: the mark says, in the hand-back, whether the run might have made the plan, and the stored-state check still requires it for a recorded plan.

Frontmatter

iddcn-2610311034456152
typedecision
date2026-10-31

mentions2