This is the record of an abcd-managed repository

abcdBetav0.16.2 · 2026-11-06

Development record

launch phase ownership contradicts across the record: phase-1-ahoy.md and build-sequence.md make install plus launch the first milestone, but 04-surfaces/04-launch.md says full launch builds in Phase 5. ADR-bound.

issueresolvedcriticaliss-1

launch phase ownership contradicts across the record: phase-1-ahoy.md and build-sequence.md make install plus launch the first milestone, but 04-surfaces/04-launch.md says full launch builds in Phase 5. ADR-bound.

Frontmatter

idiss-1
typeissue
lifecycleresolved
severitycritical

Referenced by2

mentions11