This is the record of an abcd-managed repository

abcdBetav0.16.2 · 2026-11-06

Development record

itd-85 shipped whole but still sits in intents/drafts/: abcd audit ships with all five v1 rules, the tri-state exit and the prepare-this-repo wiring the intent scopes, yet the intent was never promoted, so the record cannot say the capability is delivered. Promotion is blocked on the shipped/ schema, which requires a non-null spec_id and an impact value the intent has never carried (there is no spc-N for the audit verb). Disposition: mint or retro-link a spec via /abcd:intent link, set impact, run the fidelity review, and move drafts/ -> shipped/. Until then the v0.2.0 CHANGELOG entry describes abcd audit without citing itd-85 (iss-41).

issuewontfixmajoriss-180

itd-85 shipped whole but still sits in intents/drafts/: abcd audit ships with all five v1 rules, the tri-state exit and the prepare-this-repo wiring the intent scopes, yet the intent was never promoted, so the record cannot say the capability is delivered. Promotion is blocked on the shipped/ schema, which requires a non-null spec_id and an impact value the intent has never carried (there is no spc-N for the audit verb). Disposition: mint or retro-link a spec via /abcd:intent link, set impact, run the fidelity review, and move drafts/ -> shipped/. Until then the v0.2.0 CHANGELOG entry describes abcd audit without citing itd-85 (iss-41).

Frontmatter

idiss-180
typeissue
lifecyclewontfix
severitymajor

mentions3