This is the record of an abcd-managed repository

abcdBetav0.16.2 · 2026-11-06

Development record

Multi-project adoption raises the priority of itd-91 (AI-attribution preference) and itd-92 (branch-protection verification) from 'good hygiene' to 'the product claim'. What abcd-cli has today is its OWN answer hard-coded: scripts/check-attribution.sh names specific banned footers and a fixed required trailer, and .github/workflows/attribution.yml is a hand-written file in one repo. Neither is portable, which is exactly the gap itd-91 already states — a project adopting abcd inherits abcd's preference by reading its docs but has no first-class way to declare its own (Co-Authored-By, none at all, or house style). The durable home is a rule in internal/core/lint beside deliverystate, indexdrift and citations: reachable from CLI and plugin, run in any managed repo, reading a declared per-repo preference rather than a constant. Two further observations from the 2026-08-11 session. (1) SCAFFOLD IS THE DELIVERY MECHANISM. internal/core/launch/scaffold renders exactly three artefacts into a managed repo today (release.yml, auto-release.yml, the runbook); an attribution workflow becomes the fourth, so every managed repo inherits the gate from one template instead of someone copying a file. It would automatically gain the self-scaffold parity property — and with it the dependabot pin problem of iss-209, which the sync tool merged in PR #215 already handles. The work just landed is the delivery rail for making this portable. (2) ITD-92 GATES EVERYTHING ELSE. A scaffolded gate that no repo adds to its required status checks is decoration; across N repos the required-check wiring and the enforce_admins policy stop being settings a maintainer clicks and become policy abcd asserts and verifies. That makes itd-92 arguably the higher-leverage of the pair: it is what converts every abcd-scaffolded check, present and future, from advisory into binding. itd-92's own capture note already says this in miniature — 'captured 2026-07-17, the day abcd-cli's own main was protected by hand — work the tool should carry for every repo it manages'. Both intents are still ungrilled drafts.

issueopenmajoriss-211

Multi-project adoption raises the priority of itd-91 (AI-attribution preference) and itd-92 (branch-protection verification) from 'good hygiene' to 'the product claim'. What abcd-cli has today is its OWN answer hard-coded: scripts/check-attribution.sh names specific banned footers and a fixed required trailer, and .github/workflows/attribution.yml is a hand-written file in one repo. Neither is portable, which is exactly the gap itd-91 already states — a project adopting abcd inherits abcd's preference by reading its docs but has no first-class way to declare its own (Co-Authored-By, none at all, or house style). The durable home is a rule in internal/core/lint beside deliverystate, indexdrift and citations: reachable from CLI and plugin, run in any managed repo, reading a declared per-repo preference rather than a constant. Two further observations from the 2026-08-11 session. (1) SCAFFOLD IS THE DELIVERY MECHANISM. internal/core/launch/scaffold renders exactly three artefacts into a managed repo today (release.yml, auto-release.yml, the runbook); an attribution workflow becomes the fourth, so every managed repo inherits the gate from one template instead of someone copying a file. It would automatically gain the self-scaffold parity property — and with it the dependabot pin problem of iss-209, which the sync tool merged in PR #215 already handles. The work just landed is the delivery rail for making this portable. (2) ITD-92 GATES EVERYTHING ELSE. A scaffolded gate that no repo adds to its required status checks is decoration; across N repos the required-check wiring and the enforce_admins policy stop being settings a maintainer clicks and become policy abcd asserts and verifies. That makes itd-92 arguably the higher-leverage of the pair: it is what converts every abcd-scaffolded check, present and future, from advisory into binding. itd-92's own capture note already says this in miniature — 'captured 2026-07-17, the day abcd-cli's own main was protected by hand — work the tool should carry for every repo it manages'. Both intents are still ungrilled drafts.

Deferral 2026-09-29

Deferred past v0.11.1: The product thinker's ruling M4 of 2026-09-23: plan both itd-91 and itd-92 next cycle, each through its own planning interview and then a spec. Both are still drafts. Owed: the two interviews, and one question: which goes first, itd-91 (a declared attribution preference) or itd-92 (branch-protection verification)?

Remedy grounds (2026-09-29)

  • The record's own argument holds both ways: itd-92 turns every scaffolded check from advisory into binding, itd-91 makes the gate portable. The order is the owed question, so the remedy states the first plan for each answer and picks neither.
  • Rejected: copying scripts/check-attribution.sh into each managed repository, which is the non-portable state the record describes.

Frontmatter

idiss-211
typeissue
lifecycleopen
severitymajor

mentions5