This is the record of an abcd-managed repository

abcdBetav0.16.2 · 2026-11-06

Development record

drafts/itd-70 is a machine-emitted stub, not a press-release intent: no press release, no scope, no acceptance criteria, and a provenance line citing spc-75 which exists nowhere (iss-239's class). The drafts lint sanctions its frontmatter shape, so the only defensible action is editorial — flesh it into a press release before anyone plans it, or delete it and let open iss-194 carry the release-retention concern.

issueopennitpickiss-2608271804188295

drafts/itd-70 is a machine-emitted stub, not a press-release intent: no press release, no scope, no acceptance criteria, and a provenance line citing spc-75 which exists nowhere (iss-239's class). The drafts lint sanctions its frontmatter shape, so the only defensible action is editorial — flesh it into a press release before anyone plans it, or delete it and let open iss-194 carry the release-retention concern.

Remedy grounds (2026-09-29)

  • J21 rules to plan itd-70, so deleting the draft is off the table and the remaining work is the fleshing the planning interview performs; iss-194 has resolved, leaving iss-282 as the open carrier the press release draws from.
  • No outside-practice check: an editorial repair of an internal record.
  • Rejected: deleting the draft, which the J21 ruling overtakes.

Frontmatter

idiss-2608271804188295
typeissue
lifecycleopen
severitynitpick

mentions4