Development record
The ship ceremony's repoint step names two link classes -- every intents/planned link to the shipping intent, and the closing spec's bare sibling links to still-open specs plus bare links to it from open specs. A third class exists and is not named: a link from an ALREADY-CLOSED spec pointing at ../open/<the spec being closed>. Closing spc-62 left spc-61, itself already closed, holding ../open/spc-62 and record-lint refused with a links_resolve BLOCKER. The survey greps the checklist implies (specs/open/ and bare siblings) do not match that shape, so it is invisible until the gate runs. Class (b) is already recorded as having broken two earlier ships; this is a third sibling of the same shape and the checklist should name all three, or the repoint should be mechanical rather than a hand survey.
The ship ceremony's repoint step names two link classes -- every intents/planned link to the shipping intent, and the closing spec's bare sibling links to still-open specs plus bare links to it from open specs. A third class exists and is not named: a link from an ALREADY-CLOSED spec pointing at ../open/<the spec being closed>. Closing spc-62 left spc-61, itself already closed, holding ../open/spc-62 and record-lint refused with a links_resolve BLOCKER. The survey greps the checklist implies (specs/open/ and bare siblings) do not match that shape, so it is invisible until the gate runs. Class (b) is already recorded as having broken two earlier ships; this is a third sibling of the same shape and the checklist should name all three, or the repoint should be mechanical rather than a hand survey.
Grounds
Frontmatter
| id | iss-2608311127491949 |
|---|---|
| type | issue |
| lifecycle | resolved |
| severity | major |
.abcd/work/issues/resolved/iss-2608311127491949-the-ship-ceremony-s-repoint-step-names.md
open on GitHub ↗ · commit history ↗