Development record

Present-state planning prose still calls itd-2609091014076309 'the store draft' although the intent is in planned/: itd-148 (lines 64 and 188), spc-42 (lines 27 and 112) and iss-213 (line 11). The drift fix for iss-2610090744073409 corrected the CONCURRENCY rule, the build brief page and lane.go, and left these planning records as out of its remedy's scope; its ruthless review recorded them.

issueresolvednitpickiss-2610111926302792

Present-state planning prose still calls itd-2609091014076309 'the store draft' although the intent is in planned/: itd-148 (lines 64 and 188), spc-42 (lines 27 and 112) and iss-213 (line 11). The drift fix for iss-2610090744073409 corrected the CONCURRENCY rule, the build brief page and lane.go, and left these planning records as out of its remedy's scope; its ruthless review recorded them.

Grounds

  • pursued: no present-state paragraph of itd-148, spc-42 or iss-213 calls the planned store intent a draft, and the extended test fails if one does; shown wrong by any 'store draft' or 'that draft' left outside a dated Deferral section of those records, or by the test passing on the pre-fix text (it failed there with 13 findings).

Frontmatter

idiss-2610111926302792
typeissue
lifecycleresolved
severitynitpick

mentions6