On 2026-10-24 the main checkout of abcd had no git hooks installed: core.hooksPath was unset in every config scope and the common .git/hooks held only samples, so the committed .githooks (commit-msg, pre-commit, pre-push) ran for no commit and no push made from it or from its linked worktrees. Several sessions were committing and pushing that day. Nothing said so: commits went through silently, a commit message naming an issue without a Refs: line (RS004) was accepted at commit time, and a push to origin was made with no preflight receipt, which the pre-push hook exists to refuse. The gap surfaced only because make preflight's lint-issues gate failed afterwards. How the setting was lost is not known; the setup redesign under way the same day touches the hooks. abcd ahoy reports install state but did not flag it, and no commit verb checks it before writing.
On 2026-10-24 the main checkout of abcd had no git hooks installed: core.hooksPath was unset in every config scope and the common .git/hooks held only samples, so the committed .githooks (commit-msg, pre-commit, pre-push) ran for no commit and no push made from it or from its linked worktrees. Several sessions were committing and pushing that day. Nothing said so: commits went through silently, a commit message naming an issue without a Refs: line (RS004) was accepted at commit time, and a push to origin was made with no preflight receipt, which the pre-push hook exists to refuse. The gap surfaced only because make preflight's lint-issues gate failed afterwards. How the setting was lost is not known; the setup redesign under way the same day touches the hooks. abcd ahoy reports install state but did not flag it, and no commit verb checks it before writing.
Related: the setup redesign under way the same day (branch feat/setup-redesign, not yet on origin) captured the ahoy side of this as its own issue: ahoy reported clean while the hooks were unarmed, so setup never offered to arm them, and the redesign makes arming them a question the person approves. The session behind it found the hooks already unarmed at its first ahoy run that morning, about 08:12 UTC, before any setup run of its own.
Frontmatter
| id | iss-2610241133284600 |
|---|---|
| type | issue |
| lifecycle | resolved |
| severity | major |
.abcd/work/issues/resolved/iss-2610241133284600-on-2026-10-24-the-main-checkout-of-abcd.md
open on GitHub ↗ · commit history ↗
mentions1
- dcn-26102719225024802026-10-27 — Majors ruling for the next cut, product thinker, 27 October 2026, on abcd-78's recommendations for the 17 hand-captured majors since v0.15.1. Fix before the cut: the eight recommended fixes (iss-2610251555094324, iss-2610241537197997, iss-2610241414124940, iss-2610241911052191, iss-2610241240133009, iss-2610241133284600, iss-2610241239492159, iss-2610241519088123) and five recommended for deferral that the product thinker chose to fix instead: the short install command in the docs (iss-2610240827243654), a worktree per session (iss-2610240859590333), clearing lapsed holds everywhere (iss-2610241107191205), the reflect criteria (iss-2610241431221889) and the measured home-folder receipt (iss-2610241551259104). Deferred one cycle: iss-2610241228359748, iss-2610240932215918, iss-2610241613191748. Amended and closed: iss-2610241427397332 (itd-3's obsolete criteria). The 69 consistency-pass majors are ruled on branch decisions/interview-2026-10-27.