This is the record of an abcd-managed repository

abcdBetav0.16.2 · 2026-11-06

Development record

make preflight's smoke lane runs before the load gate under go test's default ten-minute timeout, and at a one-minute load of 18 on ten cores the whole evals package ran out of time (TestEveryCommittedEntryFitsItsDeclaredWindow among the tests still running), failing a records-only branch's preflight after about twenty minutes

issueresolvedmajoriss-2610241524383006

make preflight's smoke lane runs before the load gate under go test's default ten-minute timeout, and at a one-minute load of 18 on ten cores the whole evals package ran out of time (TestEveryCommittedEntryFitsItsDeclaredWindow among the tests still running), failing a records-only branch's preflight after about twenty minutes

Frontmatter

idiss-2610241524383006
typeissue
lifecycleresolved
severitymajor