Development record
Concurrent preflights on one machine all fail: on 2026-10-24 a records-only branch's preflight reached its test stage while six other preflights and several direct test runs shared a 10-core machine at a load near 20, and six packages (cloudscripts, ahoy, autonomy, claim, embargo, implement/loop) hit their 20-minute per-binary timeouts, so the run failed on nothing its own change touched. The load gate admits each preflight's test stage once the load dips under its limit, and the stages before it run ungated, so every admitted run then competes with the rest and none can finish inside its timeouts. Wrapping the whole run in the gate's command form, which one session found by hand, serialises them.
Concurrent preflights on one machine all fail: on 2026-10-24 a records-only branch's preflight reached its test stage while six other preflights and several direct test runs shared a 10-core machine at a load near 20, and six packages (cloudscripts, ahoy, autonomy, claim, embargo, implement/loop) hit their 20-minute per-binary timeouts, so the run failed on nothing its own change touched. The load gate admits each preflight's test stage once the load dips under its limit, and the stages before it run ungated, so every admitted run then competes with the rest and none can finish inside its timeouts. Wrapping the whole run in the gate's command form, which one session found by hand, serialises them.
Frontmatter
| id | iss-2610241537197997 |
|---|---|
| type | issue |
| lifecycle | resolved |
| severity | major |
.abcd/work/issues/resolved/iss-2610241537197997-concurrent-preflights-on-one-machine-all.md
open on GitHub ↗ · commit history ↗
mentions2
- dcn-26102719225024802026-10-27 — Majors ruling for the next cut, product thinker, 27 October 2026, on abcd-78's recommendations for the 17 hand-captured majors since v0.15.1. Fix before the cut: the eight recommended fixes (iss-2610251555094324, iss-2610241537197997, iss-2610241414124940, iss-2610241911052191, iss-2610241240133009, iss-2610241133284600, iss-2610241239492159, iss-2610241519088123) and five recommended for deferral that the product thinker chose to fix instead: the short install command in the docs (iss-2610240827243654), a worktree per session (iss-2610240859590333), clearing lapsed holds everywhere (iss-2610241107191205), the reflect criteria (iss-2610241431221889) and the measured home-folder receipt (iss-2610241551259104). Deferred one cycle: iss-2610241228359748, iss-2610240932215918, iss-2610241613191748. Amended and closed: iss-2610241427397332 (itd-3's obsolete criteria). The 69 consistency-pass majors are ruled on branch decisions/interview-2026-10-27.
- itd-2610262127138979A preflight waits for its turn as one whole run