This is the record of an abcd-managed repository

abcdBetav0.16.2 · 2026-11-06

Development record

Invariant 8 requires every intent's press release to carry Acceptance Criteria; the intent chapter says a bench draft may carry none

issueopenminoriss-2610262030417187

Invariant 8 requires every intent's press release to carry Acceptance Criteria; the intent chapter says a bench draft may carry none

A premise contradiction (severity minor) found by the cross-document consistency pass.

  • End A: .abcd/development/brief/02-constraints/03-invariants.md:153 — "every intent's press release is followed by a ## Acceptance Criteria block in Given-When-Then format (per itd-1)"
  • End B: .abcd/development/brief/04-surfaces/05-intent.md:506 — "a draft still on the bench may carry none"

03-invariants lists, as a non-negotiable invariant, that every intent's press release is followed by a Given-When-Then Acceptance Criteria block, while 05-intent records as accepted convention that a draft on the bench may carry none, and counts four drafts doing so. A draft with a press release and no criteria violates the invariant yet is admitted by the chapter.

Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 32.

Frontmatter

idiss-2610262030417187
typeissue
lifecycleopen
severityminor

mentions1