Development record
The truth rule admits only shipped or decided staged machinery; the intent chapter keeps a staged audit-loop design it says was re-scoped away
The truth rule admits only shipped or decided staged machinery; the intent chapter keeps a staged audit-loop design it says was re-scoped away
A premise contradiction (severity minor) found by the cross-document consistency pass.
- End A:
.abcd/development/brief/00-meta.md:9— "but never an undecided option: the brief records no proposals, no alternatives still under consideration, no aspirational maybes" - End B:
.abcd/development/brief/04-surfaces/05-intent.md:578— "This per-intent shape predates itd-50's 2026-09-21 re-scope, which makes the loop the last stage ofabcd buildrather than a per-intent mode"
00-meta says the brief records no proposals or undecided options, only shipped machinery or a staged target a future change builds toward, while 05-intent sets out the per-intent audit_mode loop as staged and says that shape predates itd-50's re-scope, which moved the loop into abcd build, with the rewrite owed. The passage describes a design the record no longer builds toward.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 58.
Frontmatter
| id | iss-2610262030536960 |
|---|---|
| type | issue |
| lifecycle | open |
| severity | minor |
.abcd/work/issues/open/iss-2610262030536960-the-truth-rule-admits-only-shipped-or.md
open on GitHub ↗ · commit history ↗
mentions1
- itd-50The Audit Loop Drives An Intent To Acceptance — Or Calls For A Replan