Development record
04-scope defines what has shipped by the intents in shipped/ and the derived release, phases being history; 03-out-of-scope still frames the brief around eight planned phases and defines what has shipped by which phases are complete.
04-scope defines what has shipped by the intents in shipped/ and the derived release, phases being history; 03-out-of-scope still frames the brief around eight planned phases and defines what has shipped by which phases are complete.
A premise contradiction (severity major) found by the cross-document consistency pass.
- End A:
.abcd/development/brief/01-product/04-scope.md:42— "What has shipped is defined by which intents are inshipped/, and the checkpoint is the derived release" - End B:
.abcd/development/brief/06-delivery/03-out-of-scope.md:174— "What has shipped is defined by which phases are complete and which intents are inshipped/"
04-scope says no stored unit sits above the intent, the phase documents are history, and 'What has shipped is defined by which intents are in shipped/, and the checkpoint is the derived release'. 03-out-of-scope opens with the work bundled into the eight planned phases, schedules a planned intent when a phase doc's ## Scope names it, has a later-phase intent enter work by being scoped into a phase, and closes with 'What has shipped is defined by which phases are complete and which intents are in shipped/'. 04-scope names 03-out-of-scope as the canonical out-of-scope list, so a reader following that pointer is handed the retired sequencing model as current.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 113.
Deferral 2026-10-27
Deferred past v0.15.1: Deferred by the product thinker on 2026-10-27 (dcn-2610271112330536): the brief's single-home rewrite (dcn-2610271112339516, dcn-2610271112330235) rewrites or removes most of the passages this record quotes.
Frontmatter
| id | iss-2610262031188637 |
|---|---|
| type | issue |
| lifecycle | open |
| severity | major |
.abcd/work/issues/open/iss-2610262031188637-04-scope-defines-what-has-shipped-by-the.md
open on GitHub ↗ · commit history ↗
mentions3
- dcn-26102711123302352026-10-27 — The product thinker ruled on 2026-10-27 that the design brief shows the target design, in the present tense, with a status tag where a part is built, rather than the shipped state. With the ruling that behaviour lives in the command pages, the brief holds the product as aimed for and why, and the command pages hold what abcd does today. This reverses itd-147's currency rule, so a superseding ADR is owed, and the brief's checks are rebuilt around the status overlay.
- dcn-26102711123305362026-10-27 — The product thinker accepted on 2026-10-27 the triage of the 1301 records the 2026-10-26 consistency pass filed. The duplicates, the records a later record already settles, the ones that are no contradiction and the one already fixed are closed with each reader's reason. Every other record gets its fix as its remedy, the rulings' accepted answers included, so a drain can take it. The 45 major records left open are deferred past v0.15.1, because the brief's single-home rewrite rewrites or removes most of the passages they quote. The person ruled the major rulings one at a time; the minor rulings take their recommended answers.
- dcn-26102711123395162026-10-27 — The product thinker ruled on 2026-10-27 that each abcd command's behaviour is written once, in its command page, which agents follow when they run it. The brief's chapter for the command keeps why the command exists, its trade-offs and why it refuses what it does, with its sub-verb table and generated appendix, and points to the command page for behaviour. The documentation-fidelity check moves to the command pages. This reverses the behaviour half of adr-2609231028044006 and invariant 18, so a superseding ADR is owed.