This is the record of an abcd-managed repository

abcdBetav0.16.2 · 2026-11-06

Development record

03-mental-model says planning several intents onto one spec in one act (itd-34) is planned; the verification matrix records the --bundle plan as shipped behaviour.

issueopenminoriss-2610262031195463

03-mental-model says planning several intents onto one spec in one act (itd-34) is planned; the verification matrix records the --bundle plan as shipped behaviour.

A premise contradiction (severity minor) found by the cross-document consistency pass.

  • End A: .abcd/development/brief/01-product/03-mental-model.md:56 — "(planning several intents onto one spec in a single act is itd-34, planned)"
  • End B: .abcd/development/brief/06-delivery/02-verification-matrix.md:80 — "plans several drafts as ONE shared spec"

03-mental-model says '(planning several intents onto one spec in a single act is itd-34, planned)', and describes the third auditor role as already suggesting reclassifications. The matrix's Three intent kinds (itd-34) row, a row describing behaviour the binary carries today, says intent plan with --bundle 'plans several drafts as ONE shared spec' whose close ships every member, while it stages the shape-classification role. The two documents disagree on which halves of itd-34 are delivered.

Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 114.

Frontmatter

idiss-2610262031195463
typeissue
lifecycleopen
severityminor

mentions1