Development record
itd-196 runs its cumulative and closing rehearsals per phase, while the mental model retires the phase
itd-196 runs its cumulative and closing rehearsals per phase, while the mental model retires the phase
A premise contradiction (severity major) found by the cross-document consistency pass.
- End A:
.abcd/development/intents/disciplines/itd-196-a-capability-is-rehearsed-end-to-end.md:40— "The cumulative rung is what turns a phase into something more than a list of" - End B:
.abcd/development/brief/01-product/03-mental-model.md:56— "The phase and the milestone are retired; the documents under"
itd-196's second and third rungs run what the phase can deliver so far and everything the phase set out to deliver at the phase's close, and say the cumulative rung turns a phase into something more than a list of merged intents. The mental model says the phase and the milestone are retired, with no planned end condition beyond each intent's criteria and the derived release. Two of the discipline's three rungs are keyed to a unit the record no longer has, so nothing triggers them.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 153.
Grounds
- declined: Closed in the 2026-10-27 triage (dcn-2610271112330536) as a duplicate of iss-2610262042291241. Same unit problem in itd-196 as iss-2610262042291241, cited against the mental model.
Frontmatter
| id | iss-2610262031375064 |
|---|---|
| type | issue |
| lifecycle | wontfix |
| severity | major |
.abcd/work/issues/wontfix/iss-2610262031375064-itd-196-runs-its-cumulative-and-closing.md
open on GitHub ↗ · commit history ↗
References1
- itd-196A capability is rehearsed end to end before it ships, over a real tree, in a throwaway snapshotrelated
mentions2
- dcn-26102711123305362026-10-27 — The product thinker accepted on 2026-10-27 the triage of the 1301 records the 2026-10-26 consistency pass filed. The duplicates, the records a later record already settles, the ones that are no contradiction and the one already fixed are closed with each reader's reason. Every other record gets its fix as its remedy, the rulings' accepted answers included, so a drain can take it. The 45 major records left open are deferred past v0.15.1, because the brief's single-home rewrite rewrites or removes most of the passages they quote. The person ruled the major rulings one at a time; the minor rulings take their recommended answers.
- iss-2610262042291241The glossary calls the phase a retired sequencing unit; the rehearsal discipline builds its rungs on live phases