Development record
itd-192 decides a verdict by whether this phase wires a criterion, while the scope chapter makes phases history
itd-192 decides a verdict by whether this phase wires a criterion, while the scope chapter makes phases history
A terminology drift (severity minor) found by the cross-document consistency pass.
- End A:
.abcd/development/intents/disciplines/itd-192-an-acceptance-criterion-whose-producer.md:16— "is judged by whether this phase wires it, not by whether the narrowing was disclosed" - End B:
.abcd/development/brief/01-product/04-scope.md:3— "The phase documents underroadmap/phases/are history."
itd-192's one test is whether this phase wires the criterion: wired in this phase is MET_WITH_CONCERNS, not wired is NOT_MET. The scope chapter says no stored unit sits above the intent for sequence and the phase documents are history. The rule's deciding unit is retired vocabulary, so an auditor cannot tell which delivery the question is asked of.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 154.
Grounds
- declined: Closed in the 2026-10-27 triage (dcn-2610271112330536) as a duplicate of iss-2610262042302710. Same unit problem in itd-192 as iss-2610262042302710, cited against the scope chapter.
Frontmatter
| id | iss-2610262031376440 |
|---|---|
| type | issue |
| lifecycle | wontfix |
| severity | minor |
.abcd/work/issues/wontfix/iss-2610262031376440-itd-192-decides-a-verdict-by-whether.md
open on GitHub ↗ · commit history ↗
References1
- itd-192An acceptance criterion whose producer does not exist is judged by whether this phase wires it, not by whether the narrowing was disclosedrelated
mentions2
- dcn-26102711123305362026-10-27 — The product thinker accepted on 2026-10-27 the triage of the 1301 records the 2026-10-26 consistency pass filed. The duplicates, the records a later record already settles, the ones that are no contradiction and the one already fixed are closed with each reader's reason. Every other record gets its fix as its remedy, the rulings' accepted answers included, so a drain can take it. The 45 major records left open are deferred past v0.15.1, because the brief's single-home rewrite rewrites or removes most of the passages they quote. The person ruled the major rulings one at a time; the minor rulings take their recommended answers.
- iss-2610262042302710itd-192 decides verdicts by whether this phase wires a criterion, a unit the glossary calls retired