Development record
itd-7 depends on a dev-sync pre-pack step it calls 'already in brief'; the brief lists dev-sync only among out-of-scope work not yet under way.
itd-7 depends on a dev-sync pre-pack step it calls 'already in brief'; the brief lists dev-sync only among out-of-scope work not yet under way.
A sequencing impossibility (severity minor) found by the cross-document consistency pass.
- End A:
.abcd/development/intents/planned/itd-7-rp-workspace-portability.md:38— "dev-sync runs as a pre-pack step (already in brief)" - End B:
.abcd/development/brief/01-product/01-press-release.md:33— "scheduleddev-sync, opencode harness portability"
itd-7 hangs both its pull and its pack on dev-sync: the workspace is written on dev-sync, and 'dev-sync runs as a pre-pack step (already in brief)'. The brief's press release lists 'scheduled dev-sync' among the out-of-scope items that are not yet under way and live as draft intents, and describes the pack as three passes with no dev-sync step. As written, the planned intent depends on a verb and a pack step the brief records as unbuilt, and its claim that the step is already in the brief does not hold.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 191.
Grounds
- declined: Closed in the 2026-10-27 triage (dcn-2610271112330536) as a duplicate of iss-2610262034360121. Same End A (itd-7 line 38 claims dev-sync is already in the brief); the brief lists scheduled dev-sync as unbuilt and no dev-sync code exists.
Frontmatter
| id | iss-2610262031537827 |
|---|---|
| type | issue |
| lifecycle | wontfix |
| severity | minor |
.abcd/work/issues/wontfix/iss-2610262031537827-itd-7-depends-on-a-dev-sync-pre-pack.md
open on GitHub ↗ · commit history ↗
References1
- itd-7Lifeboats Carry RepoPrompt Workspace Definitions Forwardrelated
mentions2
- dcn-26102711123305362026-10-27 — The product thinker accepted on 2026-10-27 the triage of the 1301 records the 2026-10-26 consistency pass filed. The duplicates, the records a later record already settles, the ones that are no contradiction and the one already fixed are closed with each reader's reason. Every other record gets its fix as its remedy, the rulings' accepted answers included, so a drain can take it. The 45 major records left open are deferred past v0.15.1, because the brief's single-home rewrite rewrites or removes most of the passages they quote. The person ruled the major rulings one at a time; the minor rulings take their recommended answers.
- iss-2610262034360121itd-7 builds its workspace pull on dev-sync, a pre-pack step it says is already in the brief; the board chapter says no dev-sync verb or code exists anywhere.