This is the record of an abcd-managed repository

abcdBetav0.16.2 · 2026-11-06

Development record

The mental model says the Now/Next/Later status block's intent is planned; that intent is on the shipped shelf and says the board shows the block.

issueopenminoriss-2610262032008964

The mental model says the Now/Next/Later status block's intent is planned; that intent is on the shipped shelf and says the board shows the block.

A premise contradiction (severity minor) found by the cross-document consistency pass.

  • End A: .abcd/development/brief/01-product/03-mental-model.md:3 — "the status block that renders it is itd-2609212103568351, planned"
  • End B: .abcd/development/intents/shipped/itd-2609212103568351-the-bare-abcd-status-board-and-the-site.md:21 — "abcd and the site's Status page show Now, Next and Later, computed from the record and maintained by nobody."

The brief names itd-2609212103568351 as the record that renders the status block and calls it planned. The corpus holds that record under intents/shipped/, and its press release says the bare board and the site's Status page show Now, Next and Later. The block cannot be both unbuilt and shipped, so a reader of the brief would take a delivered surface for future work.

Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 207.

Frontmatter

idiss-2610262032008964
typeissue
lifecycleopen
severityminor

References1