This is the record of an abcd-managed repository

abcdBetav0.16.2 · 2026-11-06

Development record

The press release says `/abcd:intent shape` (Role 3) is designed and not yet built; the shipped itd-34 has that role in scope, running from the pre-commit hook and on demand.

issuewontfixminoriss-2610262032038666

The press release says /abcd:intent shape (Role 3) is designed and not yet built; the shipped itd-34 has that role in scope, running from the pre-commit hook and on demand.

A premise contradiction (severity minor) found by the cross-document consistency pass.

  • End A: .abcd/development/brief/01-product/01-press-release.md:26 — "Two companions are designed and not yet built: /abcd:intent grill (per itd-27), a Socratic interview that stress-tests an intent, or a brief section, before it is planned; and /abcd:intent shape (Role 3), which keeps each intent's kind honest as the corpus grows."
  • End B: .abcd/development/intents/shipped/itd-34-three-intent-kinds.md:90 — "It runs continuously via the pre-commit hook (writing findings to the latest report) and on-demand via /abcd:intent shape."

The brief lists the shape role among companions not yet built. itd-34, on the shipped shelf, includes in scope a shape-classification role that runs continuously through the pre-commit hook and on demand through /abcd:intent shape. Either a shipped intent's scope was never delivered or the brief understates what shipped.

Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 215.

Grounds

  • declined: Closed in the 2026-10-27 triage (dcn-2610271112330536): a later record already settles which end holds. The quoted scope sentence in itd-34 predates the re-scope that limits the record to the bundle command and reclassify; both ends were true when written and the record says which holds.

Frontmatter

idiss-2610262032038666
typeissue
lifecyclewontfix
severityminor

References1

mentions2