Development record
itd-69's checker takes `--tree dev|public`; the platform page says there is no dev→public mirror
itd-69's checker takes --tree dev|public; the platform page says there is no dev→public mirror
A premise contradiction (severity minor) found by the cross-document consistency pass.
- End A:
.abcd/development/intents/shipped/itd-69-plugin-metadata-lockstep-update.md:62— "with an explicit--tree dev|publicargument (no auto-detection)" - End B:
.abcd/development/brief/02-constraints/01-platform.md:7— "ships a curated release artifact cut from it — there is no dev→public mirror"
itd-69's lockstep checker takes an explicit --tree dev|public argument, which assumes there is a development tree and a separate public tree. 01-platform says abcd ships one curated release artifact cut from one repository and that there is no dev→public mirror. Under that constraint, the public tree the checker selects does not exist.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 243.
Grounds
- declined: Closed in the 2026-10-27 triage (dcn-2610271112330536): the two ends do not conflict when read in full. In internal/core/launch/lockstep.go dev requires the version keys absent in the source tree and public requires them present and agreeing, in the rendered payload or any installed copy; no dev-to-public mirror is implied.
Frontmatter
| id | iss-2610262032157319 |
|---|---|
| type | issue |
| lifecycle | wontfix |
| severity | minor |
.abcd/work/issues/wontfix/iss-2610262032157319-itd-69-s-checker-takes-tree-dev-public.md
open on GitHub ↗ · commit history ↗
References1
- itd-69Plugin Metadata Stays Consistent Across Every Duplicated Surfacerelated
mentions1
- dcn-26102711123305362026-10-27 — The product thinker accepted on 2026-10-27 the triage of the 1301 records the 2026-10-26 consistency pass filed. The duplicates, the records a later record already settles, the ones that are no contradiction and the one already fixed are closed with each reader's reason. Every other record gets its fix as its remedy, the rulings' accepted answers included, so a drain can take it. The 45 major records left open are deferred past v0.15.1, because the brief's single-home rewrite rewrites or removes most of the passages they quote. The person ruled the major rulings one at a time; the minor rulings take their recommended answers.