Development record
itd-7 relies on disembark running dev-sync before the pack and writing a workspace file into the repo; the disembark chapter has no such step and never writes to the source
itd-7 relies on disembark running dev-sync before the pack and writing a workspace file into the repo; the disembark chapter has no such step and never writes to the source
A sequencing impossibility (severity major) found by the cross-document consistency pass.
- End A:
.abcd/development/brief/04-surfaces/02-disembark.md:11— "writes to the source, and a test fingerprints the source tree before and after" - End B:
.abcd/development/intents/planned/itd-7-rp-workspace-portability.md:38— "dev-sync runs as a pre-pack step (already in brief). Workspace state goes into the lifeboat naturally."
itd-7 says dev-sync runs as a pre-pack step of disembark, that this step is already in the brief, and (in its press release) that it writes .abcd/rp/workspace.json into the repository so the workspace reaches the lifeboat. The disembark chapter says the packer never writes to the source, which a before-and-after fingerprint of the source tree proves. It describes packing as one deterministic pass (inventory, destination gate, secret scan, write, voyage line) whose output paths come from the brief-section mapping, with no pre-pack step and no place in the lifeboat for a workspace file. As written, disembark cannot provide the step itd-7 depends on.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 362.
Deferral 2026-10-27
Deferred past v0.15.1: Deferred by the product thinker on 2026-10-27 (dcn-2610271112330536): the brief's single-home rewrite (dcn-2610271112339516, dcn-2610271112330235) rewrites or removes most of the passages this record quotes.
Frontmatter
| id | iss-2610262033075573 |
|---|---|
| type | issue |
| lifecycle | open |
| severity | major |
.abcd/work/issues/open/iss-2610262033075573-itd-7-relies-on-disembark-running.md
open on GitHub ↗ · commit history ↗
References1
- itd-7Lifeboats Carry RepoPrompt Workspace Definitions Forwardrelated
mentions3
- dcn-26102711123302352026-10-27 — The product thinker ruled on 2026-10-27 that the design brief shows the target design, in the present tense, with a status tag where a part is built, rather than the shipped state. With the ruling that behaviour lives in the command pages, the brief holds the product as aimed for and why, and the command pages hold what abcd does today. This reverses itd-147's currency rule, so a superseding ADR is owed, and the brief's checks are rebuilt around the status overlay.
- dcn-26102711123305362026-10-27 — The product thinker accepted on 2026-10-27 the triage of the 1301 records the 2026-10-26 consistency pass filed. The duplicates, the records a later record already settles, the ones that are no contradiction and the one already fixed are closed with each reader's reason. Every other record gets its fix as its remedy, the rulings' accepted answers included, so a drain can take it. The 45 major records left open are deferred past v0.15.1, because the brief's single-home rewrite rewrites or removes most of the passages they quote. The person ruled the major rulings one at a time; the minor rulings take their recommended answers.
- dcn-26102711123395162026-10-27 — The product thinker ruled on 2026-10-27 that each abcd command's behaviour is written once, in its command page, which agents follow when they run it. The brief's chapter for the command keeps why the command exists, its trade-offs and why it refuses what it does, with its sub-verb table and generated appendix, and points to the command page for behaviour. The documentation-fidelity check moves to the command pages. This reverses the behaviour half of adr-2609231028044006 and invariant 18, so a superseding ADR is owed.