This is the record of an abcd-managed repository

abcdBetav0.16.2 · 2026-11-06

Development record

The record page names closing the spec as a READY planned intent's next move; the build chapter makes READY the state from which an intent is built.

issueopenmajoriss-2610262033299542

The record page names closing the spec as a READY planned intent's next move; the build chapter makes READY the state from which an intent is built.

A premise contradiction (severity major) found by the cross-document consistency pass.

  • End A: .abcd/development/brief/04-surfaces/08-abcd.md:101 — "For a ready planned intent, and for its open spec, the move is closing the spec"
  • End B: .abcd/development/brief/04-surfaces/34-build.md:48 — "the implement-readiness gate the intent verb reports: planned, criteria written, the spec linked both ways and written past its stub"

08-abcd says that, for a ready planned intent and for its open spec, the next move abcd <record-id> reports is closing the spec, which ships the intent. 34-build defines READY through the implement-readiness gate (planned, criteria written, spec linked both ways and written past its stub) as the condition for starting a build. The close happens only at the landing of the lane that delivers the last step. Following the record page for a READY intent would close its spec and ship it before any of it is built.

Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 412.

Deferral 2026-10-27

Deferred past v0.15.1: Deferred by the product thinker on 2026-10-27 (dcn-2610271112330536): the brief's single-home rewrite (dcn-2610271112339516, dcn-2610271112330235) rewrites or removes most of the passages this record quotes.

Frontmatter

idiss-2610262033299542
typeissue
lifecycleopen
severitymajor

mentions3