This is the record of an abcd-managed repository

abcdBetav0.16.2 · 2026-11-06

Development record

The intent chapter defers the honoured/diverged/missing prose review to a later spec; the verification matrix says the shipped auditor prompt already emits it.

issuewontfixminoriss-2610262033425782

The intent chapter defers the honoured/diverged/missing prose review to a later spec; the verification matrix says the shipped auditor prompt already emits it.

A premise contradiction (severity minor) found by the cross-document consistency pass.

  • End A: .abcd/development/brief/04-surfaces/05-intent.md:553 — "and other prose/terminology/PRD-fidelity outputs are deferred to a later spec."
  • End B: .abcd/development/brief/06-delivery/02-verification-matrix.md:58 — "The shipped auditor prompt emits both halves: per-criterion verdicts over the acceptance criteria, each with a cited evidence pointer and a concerns verdict refused unless it names its concern, and the three-bucket prose audit."

05-intent says the press-release prose review, with its honoured / diverged / missing buckets, and the other prose outputs 'are deferred to a later spec'. The matrix's Intent audit (Role 1) row is not marked staged, so it describes what the binary carries today, and it says the shipped auditor prompt emits per-criterion verdicts 'and the three-bucket prose audit'. The bucket audit cannot be both deferred and shipped.

Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 431.

Grounds

  • declined: Closed in the 2026-10-27 triage (dcn-2610271112330536) as a duplicate of iss-2610262033223107. Same End A (05-intent.md line 553 says the gap buckets are deferred); End B is the verification matrix, which is correct.

Frontmatter

idiss-2610262033425782
typeissue
lifecyclewontfix
severityminor

mentions2