Development record
The intent chapter defers the honoured/diverged/missing prose review to a later spec; the verification matrix says the shipped auditor prompt already emits it.
The intent chapter defers the honoured/diverged/missing prose review to a later spec; the verification matrix says the shipped auditor prompt already emits it.
A premise contradiction (severity minor) found by the cross-document consistency pass.
- End A:
.abcd/development/brief/04-surfaces/05-intent.md:553— "and other prose/terminology/PRD-fidelity outputs are deferred to a later spec." - End B:
.abcd/development/brief/06-delivery/02-verification-matrix.md:58— "The shipped auditor prompt emits both halves: per-criterion verdicts over the acceptance criteria, each with a cited evidence pointer and a concerns verdict refused unless it names its concern, and the three-bucket prose audit."
05-intent says the press-release prose review, with its honoured / diverged / missing buckets, and the other prose outputs 'are deferred to a later spec'. The matrix's Intent audit (Role 1) row is not marked staged, so it describes what the binary carries today, and it says the shipped auditor prompt emits per-criterion verdicts 'and the three-bucket prose audit'. The bucket audit cannot be both deferred and shipped.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 431.
Grounds
- declined: Closed in the 2026-10-27 triage (dcn-2610271112330536) as a duplicate of iss-2610262033223107. Same End A (05-intent.md line 553 says the gap buckets are deferred); End B is the verification matrix, which is correct.
Frontmatter
| id | iss-2610262033425782 |
|---|---|
| type | issue |
| lifecycle | wontfix |
| severity | minor |
.abcd/work/issues/wontfix/iss-2610262033425782-the-intent-chapter-defers-the-honoured.md
open on GitHub ↗ · commit history ↗
mentions2
- dcn-26102711123305362026-10-27 — The product thinker accepted on 2026-10-27 the triage of the 1301 records the 2026-10-26 consistency pass filed. The duplicates, the records a later record already settles, the ones that are no contradiction and the one already fixed are closed with each reader's reason. Every other record gets its fix as its remedy, the rulings' accepted answers included, so a drain can take it. The 45 major records left open are deferred past v0.15.1, because the brief's single-home rewrite rewrites or removes most of the passages they quote. The person ruled the major rulings one at a time; the minor rulings take their recommended answers.
- iss-261026203322310705-intent defers the honoured/diverged/missing gap buckets, but 09-reflect reads gap counts from every ingested review.