Development record
The intent chapter names the phase plan under roadmap/phases/ as the canonical build order; the glossary marks phase superseded, with sequencing now dependencies plus the lifecycle shelves.
The intent chapter names the phase plan under roadmap/phases/ as the canonical build order; the glossary marks phase superseded, with sequencing now dependencies plus the lifecycle shelves.
A terminology drift (severity minor) found by the cross-document consistency pass.
- End A:
.abcd/development/brief/04-surfaces/05-intent.md:74— "the canonical build order is the phase plan at" - End B:
.abcd/development/brief/glossary/core/phase.md:18— "the sequencing layer is dependencies plus the lifecycle shelves, rendered as the Now / Next / Later status block; the phase documents stay as history."
05-intent says 'the canonical build order is the phase plan at roadmap/phases/', and elsewhere that a planned intent is 'scoped into a roadmap phase', so it uses phase as the live sequencing unit. The glossary's phase entry has status superseded and says the sequencing layer is dependencies plus the lifecycle shelves, rendered as Now / Next / Later, with the phase documents kept as history. The intent chapter states a retired term in its retired sense as current fact.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 435.
Grounds
- declined: Closed in the 2026-10-27 triage (dcn-2610271112330536) as a duplicate of iss-2610262033248041. Same End A (05-intent.md line 74, phase plan as canonical build order); End B is the superseded phase glossary entry.
Frontmatter
| id | iss-2610262033451641 |
|---|---|
| type | issue |
| lifecycle | wontfix |
| severity | minor |
.abcd/work/issues/wontfix/iss-2610262033451641-the-intent-chapter-names-the-phase-plan.md
open on GitHub ↗ · commit history ↗
mentions2
- dcn-26102711123305362026-10-27 — The product thinker accepted on 2026-10-27 the triage of the 1301 records the 2026-10-26 consistency pass filed. The duplicates, the records a later record already settles, the ones that are no contradiction and the one already fixed are closed with each reader's reason. Every other record gets its fix as its remedy, the rulings' accepted answers included, so a drain can take it. The 45 major records left open are deferred past v0.15.1, because the brief's single-home rewrite rewrites or removes most of the passages they quote. The person ruled the major rulings one at a time; the minor rulings take their recommended answers.
- iss-261026203324804105-intent names the phase plan as the canonical build order, but 08-abcd orders what gets built by build next's pick order.