Development record
itd-192 decides a verdict by whether 'this phase' wires the producer; the intent surface says phases are retired
itd-192 decides a verdict by whether 'this phase' wires the producer; the intent surface says phases are retired
A terminology drift (severity minor) found by the cross-document consistency pass.
- End A:
.abcd/development/intents/disciplines/itd-192-an-acceptance-criterion-whose-producer.md:16— "An acceptance criterion whose producer does not exist is judged by whether this phase wires it" - End B:
.abcd/development/brief/04-surfaces/05-intent.md:95— "Phases are retired, and this check is what replaces the same-phase rule a bundle once carried"
itd-192's rule turns on one question, whether this phase wires the missing producer, and grades MET_WITH_CONCERNS or NOT_MET on the answer. The intent surface says phases are retired and that the bundle check replaces the old same-phase rule. With no phase as a delivery unit, the discipline's deciding term has no referent, and an auditor cannot apply it as written.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 460.
Grounds
- declined: Closed in the 2026-10-27 triage (dcn-2610271112330536) as a duplicate of iss-2610262042302710. Same unit problem in itd-192 as iss-2610262042302710, cited against the intent surface.
Frontmatter
| id | iss-2610262033593092 |
|---|---|
| type | issue |
| lifecycle | wontfix |
| severity | minor |
.abcd/work/issues/wontfix/iss-2610262033593092-itd-192-decides-a-verdict-by-whether.md
open on GitHub ↗ · commit history ↗
References1
- itd-192An acceptance criterion whose producer does not exist is judged by whether this phase wires it, not by whether the narrowing was disclosedrelated
mentions2
- dcn-26102711123305362026-10-27 — The product thinker accepted on 2026-10-27 the triage of the 1301 records the 2026-10-26 consistency pass filed. The duplicates, the records a later record already settles, the ones that are no contradiction and the one already fixed are closed with each reader's reason. Every other record gets its fix as its remedy, the rulings' accepted answers included, so a drain can take it. The 45 major records left open are deferred past v0.15.1, because the brief's single-home rewrite rewrites or removes most of the passages they quote. The person ruled the major rulings one at a time; the minor rulings take their recommended answers.
- iss-2610262042302710itd-192 decides verdicts by whether this phase wires a criterion, a unit the glossary calls retired