Development record
The intent surface page names the roadmap phase plan as the canonical build order; itd-2609211913453478 retires phases and puts sequencing in dependencies and the lifecycle shelves.
The intent surface page names the roadmap phase plan as the canonical build order; itd-2609211913453478 retires phases and puts sequencing in dependencies and the lifecycle shelves.
A premise contradiction (severity minor) found by the cross-document consistency pass.
- End A:
.abcd/development/brief/04-surfaces/05-intent.md:74— "ID number is not an execution-order guarantee — the canonical build order is the phase plan at" - End B:
.abcd/development/intents/shipped/itd-2609211913453478-one-page-in-the-glossary-maps-abcd-s.md:55— "Phases and milestones are retired; sequencing is dependencies plus the lifecycle shelves"
05-intent.md says an intent id is not an execution-order guarantee because the canonical build order is the phase plan under roadmap/phases/, and still describes planned/ as scoped into a roadmap phase. The shipped glossary intent rules that phases and milestones are retired and that sequencing is dependencies plus the lifecycle shelves, with the phase documents kept only as history. Both cannot name the source of build order: a reader following the surface page is sent to a retired plan rather than to the dependency edges and the shelves.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 527.
Grounds
- declined: Closed in the 2026-10-27 triage (dcn-2610271112330536) as a duplicate of iss-2610262033248041. Same End A (05-intent.md line 74); End B is the shipped glossary intent that retires phases.
Frontmatter
| id | iss-2610262034508480 |
|---|---|
| type | issue |
| lifecycle | wontfix |
| severity | minor |
.abcd/work/issues/wontfix/iss-2610262034508480-the-intent-surface-page-names-the.md
open on GitHub ↗ · commit history ↗
References1
- itd-2609211913453478One page maps the record families, and phase, milestone and roadmap are retiredrelated
mentions2
- dcn-26102711123305362026-10-27 — The product thinker accepted on 2026-10-27 the triage of the 1301 records the 2026-10-26 consistency pass filed. The duplicates, the records a later record already settles, the ones that are no contradiction and the one already fixed are closed with each reader's reason. Every other record gets its fix as its remedy, the rulings' accepted answers included, so a drain can take it. The 45 major records left open are deferred past v0.15.1, because the brief's single-home rewrite rewrites or removes most of the passages they quote. The person ruled the major rulings one at a time; the minor rulings take their recommended answers.
- iss-261026203324804105-intent names the phase plan as the canonical build order, but 08-abcd orders what gets built by build next's pick order.