Development record
The retrospective seed lists planned intents whose target_release names the cut release; itd-2609212103572513's cut has already moved every such target to next.
The retrospective seed lists planned intents whose target_release names the cut release; itd-2609212103572513's cut has already moved every such target to next.
A sequencing impossibility (severity minor) found by the cross-document consistency pass.
- End A:
.abcd/development/brief/04-surfaces/09-reflect.md:59— "The planned intents whosetarget_releasenames the release and which" - End B:
.abcd/development/intents/shipped/itd-2609212103572513-an-intent-names-the-release-it-must-land.md:41— "at the cut, each unshipped target the cut passes becomesnext(whatever the following release is numbered) in the change that rolls the changelog"
09-reflect.md takes a release tag that has been cut and lists the planned intents whose target_release names that release and did not ship, and its write refuses until they are confirmed. The target intent says that at the cut each unshipped target the cut passes becomes next, in the change that rolls the changelog. By the time reflect can run, no planned intent's target still names the release, so the seed's list and the write's unshipped-targets refusal depend on a value the cut has already rewritten.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 543.
Grounds
- declined: Closed in the 2026-10-27 triage (dcn-2610271112330536) as a duplicate of iss-2610262032250865. Same End A (09-reflect.md:59) and the same sequencing impossibility; itd-2609212103572513's 'The move' bullet is the intent-side statement of the cut rewriting targets to next.
Frontmatter
| id | iss-2610262035030115 |
|---|---|
| type | issue |
| lifecycle | wontfix |
| severity | minor |
.abcd/work/issues/wontfix/iss-2610262035030115-the-retrospective-seed-lists-planned.md
open on GitHub ↗ · commit history ↗
References1
- itd-2609212103572513An intent names the release it must land by, and the cut says whether it didrelated
mentions2
- dcn-26102711123305362026-10-27 — The product thinker accepted on 2026-10-27 the triage of the 1301 records the 2026-10-26 consistency pass filed. The duplicates, the records a later record already settles, the ones that are no contradiction and the one already fixed are closed with each reader's reason. Every other record gets its fix as its remedy, the rulings' accepted answers included, so a drain can take it. The 45 major records left open are deferred past v0.15.1, because the brief's single-home rewrite rewrites or removes most of the passages they quote. The person ruled the major rulings one at a time; the minor rulings take their recommended answers.
- iss-2610262032250865Reflect lists planned intents whose target_release names the release; the cut has already rewritten every such target to next