Development record
itd-53 calls the shipped-but-unreviewed listing a consistency gate; the intent chapter uses Consistency for the Role 2 cross-document pass
itd-53 calls the shipped-but-unreviewed listing a consistency gate; the intent chapter uses Consistency for the Role 2 cross-document pass
A naming conflict (severity minor) found by the cross-document consistency pass.
- End A:
.abcd/development/intents/shipped/itd-53-review-queue-auto-drain-fidelity-gate.md:36— "A consistency gate / report that lists shipped intents whose latest fidelity review is missing or not-met" - End B:
.abcd/development/brief/04-surfaces/05-intent.md:332— "Consistency (the whole corpus, or one intent id)"
itd-53 names its list of shipped intents whose fidelity review is missing or not met a consistency gate. In the intent chapter, Consistency is the Role 2 cross-document pass over the whole corpus or one intent, and the shipped-but-unreviewed listing is the owed-reviews form of the audit sub-verb. One name covers two concepts, so a reader cannot tell which surface consistency means.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 553.
Grounds
- declined: Closed in the 2026-10-27 triage (dcn-2610271112330536): a later record already settles which end holds. The re-scope says the gate reports and never blocks and hands the standing list to another record, so the consistency gate wording is read through the banner.
Frontmatter
| id | iss-2610262035102052 |
|---|---|
| type | issue |
| lifecycle | wontfix |
| severity | minor |
.abcd/work/issues/wontfix/iss-2610262035102052-itd-53-calls-the-shipped-but-unreviewed.md
open on GitHub ↗ · commit history ↗
References1
- itd-53A Shipped Intent No Longer Drifts Out Of Audit Just Because Nobody Ran The Reviewrelated
mentions1
- dcn-26102711123305362026-10-27 — The product thinker accepted on 2026-10-27 the triage of the 1301 records the 2026-10-26 consistency pass filed. The duplicates, the records a later record already settles, the ones that are no contradiction and the one already fixed are closed with each reader's reason. Every other record gets its fix as its remedy, the rulings' accepted answers included, so a drain can take it. The 45 major records left open are deferred past v0.15.1, because the brief's single-home rewrite rewrites or removes most of the passages they quote. The person ruled the major rulings one at a time; the minor rulings take their recommended answers.