This is the record of an abcd-managed repository

abcdBetav0.16.2 · 2026-11-06

Development record

The docs chapter ships the itd-60 doc-fidelity gate, saving receipts keyed by commit; universal patterns calls the itd-60 pass a draft that is not yet built, keyed by input fingerprint.

issueopenmajoriss-2610262035265656

The docs chapter ships the itd-60 doc-fidelity gate, saving receipts keyed by commit; universal patterns calls the itd-60 pass a draft that is not yet built, keyed by input fingerprint.

A premise contradiction (severity major) found by the cross-document consistency pass.

  • End A: .abcd/development/brief/04-surfaces/10-docs.md:76 — "labelled with the commit the checkout stands at, under .abcd/.work.local/doc-fidelity/<commit>/."
  • End B: .abcd/development/brief/05-internals/04-universal-patterns.md:144 — "the doc-fidelity anti-drift pass planned under draft intent itd-60 (intents/planned/itd-60-doc-fidelity-anti-drift.md; not yet built)"

10-docs lists fidelity and fidelity record as shipped and says the record sub-verb saves the docs review as a receipt under .abcd/.work.local/doc-fidelity/<commit>/. The spec close and the release cut both wait on that receipt. 04-universal-patterns describes the same itd-60 pass as planned under a draft intent and 'not yet built', with a different on-disk contract: a content-addressed doc-fidelity/<input_fingerprint>/ tier under the log tier. Both cannot hold. Someone building from the patterns chapter would treat a gate that already blocks closes and cuts as future work, and would lay out a second, incompatible store for it.

Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 572.

Deferral 2026-10-27

Deferred past v0.15.1: Deferred by the product thinker on 2026-10-27 (dcn-2610271112330536): the brief's single-home rewrite (dcn-2610271112339516, dcn-2610271112330235) rewrites or removes most of the passages this record quotes.

Frontmatter

idiss-2610262035265656
typeissue
lifecycleopen
severitymajor

mentions4