This is the record of an abcd-managed repository

abcdBetav0.16.2 · 2026-11-06

Development record

The out-of-scope list holds itd-85, 'A Read-Only Repo-Conformance Audit', as later-phase draft work; the lint chapter ships that read-only conformance verb and cites itd-85 as its intent

issueopenminoriss-2610262035543059

The out-of-scope list holds itd-85, 'A Read-Only Repo-Conformance Audit', as later-phase draft work; the lint chapter ships that read-only conformance verb and cites itd-85 as its intent

A premise contradiction (severity minor) found by the cross-document consistency pass.

  • End A: .abcd/development/brief/06-delivery/03-out-of-scope.md:67 — "A Read-Only Repo-Conformance Audit"
  • End B: .abcd/development/brief/04-surfaces/16-lint.md:184 — "[itd-85] (../../intents/drafts/itd-85-audit-verb.md)"

03-out-of-scope.md lists itd-85 among the drafts, the uncommitted bench of later-phase items. 16-lint.md describes the shipped, read-only abcd lint repo-conformance verb, with every target marked shipped, and names itd-85 (still at its drafts path) as the intent it delivers. The capability cannot be both shipped and later-phase work that has not been committed to.

Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 608.

Frontmatter

idiss-2610262035543059
typeissue
lifecycleopen
severityminor

mentions1