This is the record of an abcd-managed repository

abcdBetav0.16.2 · 2026-11-06

Development record

itd-104 says an idea is gated before it can mint any record; the ideate chapter says ideate is optional, never a gate, and required by no other verb

issuewontfixminoriss-2610262036303950

itd-104 says an idea is gated before it can mint any record; the ideate chapter says ideate is optional, never a gate, and required by no other verb

A premise contradiction (severity minor) found by the cross-document consistency pass.

  • End A: .abcd/development/intents/shipped/itd-104-abcd-gates-a-new-idea-before-it-becomes.md:17 — "abcd gates a new idea before it can mint a single record"
  • End B: .abcd/development/brief/04-surfaces/18-ideate.md:13 — "No other verb requires it, nothing warns when it is skipped"

itd-104's press release makes the gauntlet a precondition: an idea is gated before it can mint a single record. 18-ideate says ideate is optional and never a gate, that no other verb requires it and nothing warns when it is skipped. An idea cannot be both barred from minting a record until ideated and free to be captured without it.

Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 653.

Grounds

  • declined: Closed in the 2026-10-27 triage (dcn-2610271112330536): a later record already settles which end holds. Same resolution as the sibling record: the intent's grill settlement ('Optional verb, never a gate') post-dates its press-release wording and matches the chapter and the code.

Frontmatter

idiss-2610262036303950
typeissue
lifecyclewontfix
severityminor

References1

mentions1