Development record
The site-setup intent says a result followed by the error envelope is the repository-wide JSON convention; the update chapter emits a refusal as a single document.
The site-setup intent says a result followed by the error envelope is the repository-wide JSON convention; the update chapter emits a refusal as a single document.
A premise contradiction (severity minor) found by the cross-document consistency pass.
- End A:
.abcd/development/intents/shipped/itd-2609061543533170-abcd-sets-up-a-managed-repository-s.md:70— "A--jsonrun that exits 1 prints two JSON documents, the result and then the CLI's error envelope; that is the repository-wide convention" - End B:
.abcd/development/brief/04-surfaces/21-update.md:238— "In the JSON form a refusal of either kind is one document on stdout"
The site-setup intent tells a strict --json consumer that a run exiting 1 prints two documents, the result and then the CLI's error envelope, and calls this the convention across the repository. The update chapter says a refusal in JSON is one document on stdout, carrying the envelope's fields beside its own, so that no receipt is followed by a second envelope. A consumer built to the claimed repository-wide convention would misread update's refusals. So the convention is either not repository-wide or update breaks it.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 666.
Grounds
- declined: Closed in the 2026-10-27 triage (dcn-2610271112330536): a later record already settles which end holds. update.go builds one refusal document with the envelope fields; the repository-wide claim holds for other verbs.
Frontmatter
| id | iss-2610262036415345 |
|---|---|
| type | issue |
| lifecycle | wontfix |
| severity | minor |
.abcd/work/issues/wontfix/iss-2610262036415345-the-site-setup-intent-says-a-result.md
open on GitHub ↗ · commit history ↗
References1
- itd-2609061543533170One verb takes a managed repository's site from the checkout to a live addressrelated
mentions1
- dcn-26102711123305362026-10-27 — The product thinker accepted on 2026-10-27 the triage of the 1301 records the 2026-10-26 consistency pass filed. The duplicates, the records a later record already settles, the ones that are no contradiction and the one already fixed are closed with each reader's reason. Every other record gets its fix as its remedy, the rulings' accepted answers included, so a drain can take it. The 45 major records left open are deferred past v0.15.1, because the brief's single-home rewrite rewrites or removes most of the passages they quote. The person ruled the major rulings one at a time; the minor rulings take their recommended answers.