Development record
The brief index says spc references trace the predecessor's spec store and are not delivery claims; the build chapter cites a spec of this repository for what has landed.
The brief index says spc references trace the predecessor's spec store and are not delivery claims; the build chapter cites a spec of this repository for what has landed.
A premise contradiction (severity minor) found by the cross-document consistency pass.
- End A:
.abcd/development/brief/README.md:7— "spc-Nreferences throughout the brief trace" - End B:
.abcd/development/brief/04-surfaces/34-build.md:860— "the design record: spc-2609202134338445, whose Progress section says which pieces have landed."
README.md says spc-N references throughout the brief trace the predecessor implementation's spec store, as design input and not as delivery claims. 34-build.md cites spc-2609202134338445 as its design record, whose Progress section says which pieces have landed: a spec in this repository's own store, used as a delivery reference. The README's blanket rule misdescribes the spec ids this repository mints.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 697.
Grounds
- declined: Closed in the 2026-10-27 triage (dcn-2610271112330536) as a duplicate of iss-2610262035569535. Same README sentence against another chapter citing this repository's own spec (spc-2609202134338445) as a delivery reference.
Frontmatter
| id | iss-2610262037066238 |
|---|---|
| type | issue |
| lifecycle | wontfix |
| severity | minor |
.abcd/work/issues/wontfix/iss-2610262037066238-the-brief-index-says-spc-references.md
open on GitHub ↗ · commit history ↗
mentions3
- dcn-26102711123305362026-10-27 — The product thinker accepted on 2026-10-27 the triage of the 1301 records the 2026-10-26 consistency pass filed. The duplicates, the records a later record already settles, the ones that are no contradiction and the one already fixed are closed with each reader's reason. Every other record gets its fix as its remedy, the rulings' accepted answers included, so a drain can take it. The 45 major records left open are deferred past v0.15.1, because the brief's single-home rewrite rewrites or removes most of the passages they quote. The person ruled the major rulings one at a time; the minor rulings take their recommended answers.
- iss-2610262035569535The brief index says spc-N references trace the predecessor implementation's spec store and are not delivery claims; the update chapter cites spc-32 as a closed spec in this repository's own store, paired with a shipped intent
- spc-2609202134338445one-verb-takes-a-single-intent-from-ready-to-delivered-witho