Development record
itd-190 says the readiness gate enforces the claim-recording rules; 34-build says the readiness gate only reports them as advisory and enforcement happens at a run.
itd-190 says the readiness gate enforces the claim-recording rules; 34-build says the readiness gate only reports them as advisory and enforcement happens at a run.
A premise contradiction (severity minor) found by the cross-document consistency pass.
- End A:
.abcd/development/intents/disciplines/itd-190-the-claim-recording-gradient-an-intent-s.md:39— "the gradient binds standalone intents at the readiness gate from adoption on" - End B:
.abcd/development/brief/04-surfaces/34-build.md:65— "The readiness gate reports both as advisory; a run is where they bind"
itd-190's rule says the gradient binds standalone intents at the readiness gate, and that a blank scope-conditions section or an empty mechanism section is a gate fault. 34-build says the readiness gate reports the mechanism prompt and the scope conditions as advisory, and that they bind only when a build starts. Either the gate refuses, or it only advises; the two pages say opposite things.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 710.
Frontmatter
| id | iss-2610262037151611 |
|---|---|
| type | issue |
| lifecycle | open |
| severity | minor |
.abcd/work/issues/open/iss-2610262037151611-itd-190-says-the-readiness-gate-enforces.md
open on GitHub ↗ · commit history ↗
References1
- itd-190The claim recording gradient: an intent's three claim kinds carry three recording requirements, and the readiness gate holds themrelated