Development record
itd-57 says nothing holds a planned item back from autonomous pickup today; the build brief's hold check already refuses any record carrying held:
itd-57 says nothing holds a planned item back from autonomous pickup today; the build brief's hold check already refuses any record carrying held:
A premise contradiction (severity minor) found by the cross-document consistency pass.
- End A:
.abcd/development/intents/drafts/itd-57-manual-hold-sentinel.md:17— "Today, holding a spec back from the run seam means either deleting it (loses the work), leavingplan_review_statusopen (fragile — a reviewer can flip it), or hand-rolling a never-donedependency each time." - End B:
.abcd/development/brief/04-surfaces/34-build.md:68— "the record carries noheld:, well formed or not"
itd-57 assumes that today the only ways to keep work from an autonomous run are deleting it, leaving a review status open, or hand-rolling a never-done dependency, and that the selector skips specs by native spec dependency. The build chapter says no run starts, and the pick passes over, any record that carries held: in any form, and that blocking is read from the intent's blocked_by. The hold that itd-57 sets out to invent already exists on the record, so the two documents describe different pickup mechanisms for the same autonomous run.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 722.
Grounds
- declined: Closed in the 2026-10-27 triage (dcn-2610271112330536) as a duplicate of iss-2610262034233163. Same draft edit as iss-2610262034233163, set against a different statement of the same current state.
Frontmatter
| id | iss-2610262037255566 |
|---|---|
| type | issue |
| lifecycle | wontfix |
| severity | minor |
.abcd/work/issues/wontfix/iss-2610262037255566-itd-57-says-nothing-holds-a-planned-item.md
open on GitHub ↗ · commit history ↗
References1
- itd-57Every abcd Voyage Ships With A Manual-Hold Sentinel That Blocks A Spec From Autonomous Pickup Until A Human Lifts Itrelated
mentions2
- dcn-26102711123305362026-10-27 — The product thinker accepted on 2026-10-27 the triage of the 1301 records the 2026-10-26 consistency pass filed. The duplicates, the records a later record already settles, the ones that are no contradiction and the one already fixed are closed with each reader's reason. Every other record gets its fix as its remedy, the rulings' accepted answers included, so a drain can take it. The 45 major records left open are deferred past v0.15.1, because the brief's single-home rewrite rewrites or removes most of the passages they quote. The person ruled the major rulings one at a time; the minor rulings take their recommended answers.
- iss-2610262034233163itd-57 proposes a sentinel spec that keeps planned work out of autonomous pickup; the board chapter says the build's start checks already skip a held record.