The spec-steps intent starts each step's lane only after the previous step merged; the build chapter opens a lane once the steps its needs line names have landed, so lanes can run side by side.
The spec-steps intent starts each step's lane only after the previous step merged; the build chapter opens a lane once the steps its needs line names have landed, so lanes can run side by side.
A premise contradiction (severity nitpick) found by the cross-document consistency pass.
- End A:
.abcd/development/brief/04-surfaces/34-build.md:417— "A lane opens for a spec step once every step it needs has landed (its- needs:line, or by default every step before it, ruling DR6b)" - End B:
.abcd/development/intents/shipped/itd-2609212103565953-a-spec-lists-its-steps-and-the-build.md:40— "runs one lane per step in order, each landing as its own pull request; the next step's lane starts after the previous has merged"
itd-2609212103565953 says the loop runs one lane per step in order and the next step's lane starts after the previous has merged. 34-build.md opens a lane once every step it needs has landed, read from the step's - needs: line, with every earlier step only as the default, and runs lanes in parallel up to the ceiling. The two agree for a spec that declares no needs. They disagree for one that does: there the brief opens a later step's lane before the previous one merges.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 753.
Grounds
- declined: Closed in the 2026-10-27 triage (dcn-2610271112330536): a later record already settles which end holds. The two agree for a spec with no needs line; the later shipped pacing ruling names the parallel exception, and 34-build states both.
Frontmatter
| id | iss-2610262037509765 |
|---|---|
| type | issue |
| lifecycle | wontfix |
| severity | nitpick |
.abcd/work/issues/wontfix/iss-2610262037509765-the-spec-steps-intent-starts-each-step-s.md
open on GitHub ↗ · commit history ↗
References1
- itd-2609212103565953A spec lists its steps, and the build lands them one at a timerelated
mentions1
- dcn-26102711123305362026-10-27 — The product thinker accepted on 2026-10-27 the triage of the 1301 records the 2026-10-26 consistency pass filed. The duplicates, the records a later record already settles, the ones that are no contradiction and the one already fixed are closed with each reader's reason. Every other record gets its fix as its remedy, the rulings' accepted answers included, so a drain can take it. The 45 major records left open are deferred past v0.15.1, because the brief's single-home rewrite rewrites or removes most of the passages they quote. The person ruled the major rulings one at a time; the minor rulings take their recommended answers.