Development record
itd-67 has `/abcd:launch ship` tag the repo; 37-reserve has the release workflow push the release tag after the merge
itd-67 has /abcd:launch ship tag the repo; 37-reserve has the release workflow push the release tag after the merge
A premise contradiction (severity minor) found by the cross-document consistency pass.
- End A:
.abcd/development/intents/shipped/itd-67-installable-versioned-plugin.md:47— "/abcd:launch shipauto-selects the bump tier (patch/minor/major) via the brief §4 phase-completion detection, writes the new version intoplugin.json, updatesmarketplace.json(version + changelog entry), tags the repo" - End B:
.abcd/development/brief/04-surfaces/37-reserve.md:311— "the release tag is pushed by the release workflow after the merge, so a two-hour hold could lapse in the middle of a cut."
itd-67 puts tagging the repository in /abcd:launch ship itself, beside writing the new version. 37-reserve states the release tag is pushed by the release workflow after the merge, which is why the release hold lasts a day and ends when the tag appears on origin. The tag cannot be both the cut verb's own act and a workflow's act after a merge the cut waits on.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 772.
Grounds
- declined: Closed in the 2026-10-27 triage (dcn-2610271112330536): a later record already settles which end holds. 37-reserve describes the shipped sequence and the ship code writes no tag; itd-67's tagging wording is the pre-adr-37 design.
Frontmatter
| id | iss-2610262038066422 |
|---|---|
| type | issue |
| lifecycle | wontfix |
| severity | minor |
.abcd/work/issues/wontfix/iss-2610262038066422-itd-67-has-abcd-launch-ship-tag-the-repo.md
open on GitHub ↗ · commit history ↗
References1
- itd-67abcd Is An Installable, Versioned Claude Code Plugin Whose Repo Is Its Own Marketplace And Whose Every Launch Bumps, Tags, And Publishes A New Versionrelated
mentions2
- adr-37Releases are changelog-driven — rolling `[Unreleased]` is the release decision, and automation tags exactly that commit
- dcn-26102711123305362026-10-27 — The product thinker accepted on 2026-10-27 the triage of the 1301 records the 2026-10-26 consistency pass filed. The duplicates, the records a later record already settles, the ones that are no contradiction and the one already fixed are closed with each reader's reason. Every other record gets its fix as its remedy, the rulings' accepted answers included, so a drain can take it. The 45 major records left open are deferred past v0.15.1, because the brief's single-home rewrite rewrites or removes most of the passages they quote. The person ruled the major rulings one at a time; the minor rulings take their recommended answers.