This is the record of an abcd-managed repository

abcdBetav0.16.2 · 2026-11-06

Development record

The agent catalog says the auditor's third role, kind classification, is a design target; shipped itd-48 announces all three roles live, /abcd:intent shape included

issuewontfixminoriss-2610262040083517

The agent catalog says the auditor's third role, kind classification, is a design target; shipped itd-48 announces all three roles live, /abcd:intent shape included

A premise contradiction (severity minor) found by the cross-document consistency pass.

  • End A: .abcd/development/brief/05-internals/01-agents.md:137 — "The first two ship; the third is a design target."
  • End B: .abcd/development/intents/shipped/itd-48-intent-fidelity-reviewer-roles-2-3.md:24 — "With all three roles live, /abcd:intent consistency and /abcd:intent shape move from documented command surface to working command surface."

01-agents says that of the auditor's three roles the first two ship and the third, kind classification through abcd intent shape, is a design target with no shape sub-verb registered. itd-48, in shipped/, says it ships Role 3 and that with all three roles live /abcd:intent shape becomes a working command surface. The shape role cannot be both live and unbuilt.

Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 911.

Grounds

  • declined: Closed in the 2026-10-27 triage (dcn-2610271112330536): a later record already settles which end holds. The shipped intent says the shape role is not delivered, which 01-agents.md states.

Frontmatter

idiss-2610262040083517
typeissue
lifecyclewontfix
severityminor

References1

mentions1