Development record
itd-196 builds its rehearsal rungs on the phase; the phase glossary entry says the phase is superseded and survives only as history.
itd-196 builds its rehearsal rungs on the phase; the phase glossary entry says the phase is superseded and survives only as history.
A terminology drift (severity minor) found by the cross-document consistency pass.
- End A:
.abcd/development/intents/disciplines/itd-196-a-capability-is-rehearsed-end-to-end.md:40— "The cumulative rung is what turns a phase into something more than a list of" - End B:
.abcd/development/brief/glossary/core/phase.md:18— "the sequencing layer is dependencies plus the lifecycle shelves, rendered as the Now / Next / Later status block; the phase documents stay as history."
itd-196's cumulative rung and close-of-phase rung rehearse what the phase can deliver and treat the phase as a live delivery unit. The phase entry says the sequencing layer is now dependencies plus the lifecycle shelves and that the phase documents stay as history, so the rung is keyed to a unit that no longer exists.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 953.
Grounds
- declined: Closed in the 2026-10-27 triage (dcn-2610271112330536) as a duplicate of iss-2610262042291241. Same unit problem in itd-196 as iss-2610262042291241, cited against the phase glossary entry.
Frontmatter
| id | iss-2610262040451252 |
|---|---|
| type | issue |
| lifecycle | wontfix |
| severity | minor |
.abcd/work/issues/wontfix/iss-2610262040451252-itd-196-builds-its-rehearsal-rungs-on.md
open on GitHub ↗ · commit history ↗
References1
- itd-196A capability is rehearsed end to end before it ships, over a real tree, in a throwaway snapshotrelated
mentions2
- dcn-26102711123305362026-10-27 — The product thinker accepted on 2026-10-27 the triage of the 1301 records the 2026-10-26 consistency pass filed. The duplicates, the records a later record already settles, the ones that are no contradiction and the one already fixed are closed with each reader's reason. Every other record gets its fix as its remedy, the rulings' accepted answers included, so a drain can take it. The 45 major records left open are deferred past v0.15.1, because the brief's single-home rewrite rewrites or removes most of the passages they quote. The person ruled the major rulings one at a time; the minor rulings take their recommended answers.
- iss-2610262042291241The glossary calls the phase a retired sequencing unit; the rehearsal discipline builds its rungs on live phases