Development record
The site chapter puts abcd's record on abcdev.app as a surface of this repository; the Pages intent moves abcd's record to its own GitHub Pages route, like any project's.
The site chapter puts abcd's record on abcdev.app as a surface of this repository; the Pages intent moves abcd's record to its own GitHub Pages route, like any project's.
A premise contradiction (severity minor) found by the cross-document consistency pass.
- End A:
.abcd/development/brief/05-internals/10-site.md:14— "abcdev.app is a surface of this repository and of nothing else." - End B:
.abcd/development/intents/planned/itd-2610091010348892-anyone-who-opens-abcdev-app-finds-the.md:20— "abcd's own record moves to the same route, built exactly the way any other project's is."
10-site.md describes abcdev.app as the surface of this repository alone, with the record explorer at /record/ and a design target to move the root onto the rendered site. itd-2610091010348892 publishes each opted-in project's record on that project's own GitHub Pages and moves abcd's own record to the same route, leaving abcdev.app as a possible community site. The two give different homes for abcd's record.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 973.
Grounds
- declined: Closed in the 2026-10-27 triage (dcn-2610271112330536): the two ends do not conflict when read in full. A planned intent's press release states a future arrangement while the brief states what is true today (abcd's record is still served on abcdev.app), so the two ends are at different times, not in conflict; 10-site.md also already marks the root as a design target.
Frontmatter
| id | iss-2610262041024277 |
|---|---|
| type | issue |
| lifecycle | wontfix |
| severity | minor |
.abcd/work/issues/wontfix/iss-2610262041024277-the-site-chapter-puts-abcd-s-record-on.md
open on GitHub ↗ · commit history ↗
References1
- itd-2610091010348892An opted-in project's record is built at each release onto its own GitHub Pagesrelated
mentions1
- dcn-26102711123305362026-10-27 — The product thinker accepted on 2026-10-27 the triage of the 1301 records the 2026-10-26 consistency pass filed. The duplicates, the records a later record already settles, the ones that are no contradiction and the one already fixed are closed with each reader's reason. Every other record gets its fix as its remedy, the rulings' accepted answers included, so a drain can take it. The 45 major records left open are deferred past v0.15.1, because the brief's single-home rewrite rewrites or removes most of the passages they quote. The person ruled the major rulings one at a time; the minor rulings take their recommended answers.