This is the record of an abcd-managed repository

abcdBetav0.16.2 · 2026-11-06

Development record

itd-147 is sequenced as Phase 8; the phase glossary entry says roadmap phases run 0–7

issueopennitpickiss-2610262041289117

itd-147 is sequenced as Phase 8; the phase glossary entry says roadmap phases run 0–7

A premise contradiction (severity nitpick) found by the cross-document consistency pass.

  • End A: .abcd/development/intents/shipped/itd-147-the-brief-s-surface-chapters-are-a.md:99 — "Sequenced as Phase 8"
  • End B: .abcd/development/brief/glossary/core/phase.md:43 — "Roadmap phases run 0–7 and the brief's"

itd-147 says it was sequenced as Phase 8 (the brief is the shipped state). The phase glossary entry states that roadmap phases run 0–7, against the brief's plumbing-phases 0–6. A Phase 8 is outside the numbering the glossary gives, so one of the two is wrong about the phase set. Phases are retired, so the cost is low, but the entry exists to keep those history documents readable.

Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 1002.

Frontmatter

idiss-2610262041289117
typeissue
lifecycleopen
severitynitpick

References1