Development record
itd-60 is sequenced as a rung of Phase 8; the phase entry says roadmap phases run 0–7, and it retires the phase.
itd-60 is sequenced as a rung of Phase 8; the phase entry says roadmap phases run 0–7, and it retires the phase.
A premise contradiction (severity minor) found by the cross-document consistency pass.
- End A:
.abcd/development/intents/shipped/itd-60-doc-fidelity-anti-drift.md:28— "Phase 8 — the brief is the shipped state" - End B:
.abcd/development/brief/glossary/core/phase.md:43— "Roadmap phases run 0–7 and the brief's plumbing-phases run 0–6"
itd-60 places itself in 'Phase 8 — the brief is the shipped state' and its Decisions say it is sequenced as Phase 8. The phase glossary entry says roadmap phases run 0–7, and it marks the phase superseded as the sequencing layer on 2026-09-21. Either a ninth phase exists that the 0–7 numbering leaves out, or itd-60's sequencing points at a phase the glossary does not recognise.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 1057.
Grounds
- declined: Closed in the 2026-10-27 triage (dcn-2610271112330536): a later record already settles which end holds. itd-60's Phase 8 placement was true when written and the phase document still exists as history; the glossary's 0-7 count is an old point-in-time statement in an entry the record already marks superseded.
Frontmatter
| id | iss-2610262042159336 |
|---|---|
| type | issue |
| lifecycle | wontfix |
| severity | minor |
.abcd/work/issues/wontfix/iss-2610262042159336-itd-60-is-sequenced-as-a-rung-of-phase-8.md
open on GitHub ↗ · commit history ↗
References1
- itd-60When A Surface Ships, The Brief Describes It — Or The Intent Does Not Reach Shippedrelated
mentions1
- dcn-26102711123305362026-10-27 — The product thinker accepted on 2026-10-27 the triage of the 1301 records the 2026-10-26 consistency pass filed. The duplicates, the records a later record already settles, the ones that are no contradiction and the one already fixed are closed with each reader's reason. Every other record gets its fix as its remedy, the rulings' accepted answers included, so a drain can take it. The 45 major records left open are deferred past v0.15.1, because the brief's single-home rewrite rewrites or removes most of the passages they quote. The person ruled the major rulings one at a time; the minor rulings take their recommended answers.